It's been a little bit since I've shown what I'm working on, so I got out my camera and took some pictures.
This is my Aristida Shawl. I'm through the set-up chart and halfway through the second repeat of the body chart (the body chart is knit 4 times).
This is Jose's sweater. I don't know how, but it seemed stuck at about 4 - 6 inches for weeks and weeks, and suddenly I'm only 3 inches away from the armholes. I might actually get this done before the end of the year.
I've barely gotten started on my Lowry Pullover. I've just started the cable section, and I can tell that this sweater is going to take me a long time.
As if I don't have enough going on, I cast on the Spectra pattern that I was talking about in a previous post. Look at that, I have 3 wedges done! Only... 82 more to go! So far I'm loving it though.
Tomorrow I'm going to one of my local yarn shops with my mom to pick out yarn for a sweater she wants me to knit her. Yep, that'll be another sweater on the needles. I need a small project to work on.
Tour de Fleece:
Day 12 (July 11): 44 min spinning
Day 13 (July 12): 34 min spinning